India - Housing Condition and Migration Survey: NSS 49th Round, Schedule 1.2, January - June 1993
Reference ID | DDI-IND-MOSPI-NSSO-49Rnd-Sch1dot2-1993 |
Year | 1993 |
Country | India |
Producer(s) | National Sample Survey Office |
Sponsor(s) | M/o Statistics & Programme Implementation, GOI - MOSPI - |
Collection(s) | |
Metadata |
![]() |
Created on
Mar 11, 2016
Last modified
Mar 31, 2016
Page views
445033
- Block-3-Part-1-house
hold characteristics
records - Block-3-Part-2-Perso
ns--Particulars of p
ast members outside-
records - Block-4-Persons-Demo
graphic and migratio
n particulars-record
s - Block-5-Building and
environment particu
lars- Records - Block-6-Particulars
of dwelling-Records - Block-7-Particulars
of living facilities
-Records - Block-8-Part-1--Part
iculars of building
construction for res
idential purpose-Rec
ords - Block-8-Part-2--Part
iculars of building
construction for res
idential purpose-Rec
ords - Block-8-Part-3--Part
iculars of building
construction for res
idential purpose-Rec
ords - Block-9-Particulars
of dwelling-land own
ed elsewhere-Records - Block-10-Use of publ
ic distribution syst
em-Records - Block-11-General par
ticulars of slum dwe
llers-Records
Flood risk (code)
(B5_q11)
File: Block-5-Building and environment particulars- Records
File: Block-5-Building and environment particulars- Records
Overview
Type:
Discrete Format: character Width: 1 | Valid cases: 119403 Invalid: 0 |
Questions and instructions
Pre question
Check if Q.1 code is other than 1. If yes ASK
Literal question
Flood risk
Post question
If Q.1 code is 1 then skip
Categories
Value | Category | Cases | |
---|---|---|---|
0 | NA | 191 | ![]() |
1 | None | 101867 | ![]() |
2 | Excessive rain | 10849 | ![]() |
3 | River, sea etc | 6472 | ![]() |
9 | Invalid | 24 | ![]() |
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
If rain water during monsoon and / or water from sea, river etc. enters into the building premises i. e. into the ground froor of the building in normal years, the there is a flood risk for the building. To be so classified, water must have entered the grtound floor of the building at least once during the last 5 years. Information about flood risk will be recorded in cods.