India - Urban Slums Survey: NSS 65th Round, Schedule 0.21, July 2008- June 2009
Reference ID | DDI-IND-MOSPI-NSSO-65Rnd-Sch-0dot21-2008-09 |
Year | 2008 - 2009 |
Country | India |
Producer(s) | National Sample Survey Office |
Sponsor(s) | M/o Statistics & Programme Implementation, GOI - MOSPI - |
Collection(s) | |
Metadata | Documentation in PDF |
Created on
Aug 03, 2016
Last modified
Sep 02, 2016
Page views
116244
Overview
Identification
DDI-IND-MOSPI-NSSO-65Rnd-Sch-0dot21-2008-09 |
Version
2012-05-15
Overview
The first nationwide survey on the 'economic condition of slum dwellers in urban cities' was conducted by the NSSO in its 31st round (July 1976 - June 1977). The survey was restricted to (i) all the 'Class I' towns having 1971 census population one lakh or more and (ii) two 'Class II' towns, viz. Shillong and Pondicherry. The next survey on slum dwellers was carried out in the 49th round (January - June 1993), which covered rural as well as urban areas. After a gap of nearly ten years, the third survey was conducted in the 58th round (July-December 2002), covering only the urban slums. In the present round also, the survey is restricted to urban slums only. For this survey, conducted during July 2008 to June 2009, urban areas notified as slums by respective municipalities, corporations, local bodies or development authorities were treated as “notified slums”. A “non-notified slum” was a compact urban area with a collection of poorly built tenements, mostly of temporary nature, crowded together usually with inadequate sanitary and drinking water facilities in unhygienic conditions. All such slums, notified or non-notified, were considered as ‘slum’ for the purpose of the survey, if at least 20 households lived in such a slum within the selected urban block. Sample survey data [ssd]Randomly selected urban slums based on sampling procedure.
Scope
Schedule 0.21 has been framed to collect information on the present condition of the slums and on the change in the condition of some facilities available therein. The schedule was canvassed for each surveyed urban block having slum(s). Thus the schedule was canvassed in the urban sector only. Information on each slum, notified or non-notified, found in the entire selected first stage unit (FSU) was collected even if sub-block formation was resorted to. In some cases, the slum covered such a large area that it cuts across more than one FSU, and the selected FSU was part of the slum. In such cases, all the slum particulars recorded was related to only that part of the slum, which fell in the selected FSU. However, if the FSU contained a part of a notified slum with at least 20 households, then the part of the slum falling in the FSU was regarded as a notified slum and the schedule was canvassed accordingly
Schedule 0.21 consisted of eight blocks. Blocks 0 and 1 meant to record the identification particulars of the selected urban FSU. Blocks 2, 5, 6 and 7 contained particulars of field operations, remarks by the investigator/senior investigator, comments by superintendent/senior superintendent and comments by other supervisory officer(s). In Blocks 3 and 4, data were recorded for each slum inside the selected FSU.
Some general features about the slum were recorded in Block 3. Information relating to the area where the slum is located, condition of the road / lane / constructed path within and surrounding the slum, and basic amenities like electricity, drinking water, sewerage, drainage, garbage disposal, etc. were collected in this block. In Block 4, information was collected on improvement/change, if any, in the condition of some amenities of the slum during the last 5 years. Notified slum, Flood risk, Approach Road, Slum dwellers, Living facilities, Garbage disposal, Drainage, NSS 65th Round,, Schedule 0.21, July 2006 - June 2007
Coverage
The survey covered the whole URBAN area of the Indian Union.Producers and Sponsors
Name | Affiliation |
---|---|
National Sample Survey Office | M/o Statistcs and Programme Implementation(MOSPI),Government of India (GOI) |
Name | Affiliation | Role |
---|---|---|
Survey Design Reearch Division | National Sample Survey Office | Questionnaire Desgn, Sampling methodology,Survey Reports |
Field Operations Division | National Sample Survey Office | Field Work |
Data Processing Division | National Sample Survey Office | Data Processing |
Computer Centre | M/o Statistcs and Programme Implementation(MOSPI),Government of India (GOI) | Dissemination |
Name | Abbreviation | Role |
---|---|---|
M/o Statistics & Programme Implementation, GOI | MOSPI |
Name | Affiliation | Role |
---|---|---|
Governing council and Working Group | GOI | Finalisation of survey study and Questionnaire |
Metadata Production
Name | Abbreviation | Affiliation | Role |
---|---|---|---|
Computer Centre | MOSPI, CC | M | Documentation of the study |