India - Housing Condition Survey: NSS 58th Round, Schedule 1.2, July - December 2002
Reference ID | DDI-IND-MOSPI-NSSO-58Rnd-Sch1dot2-2002 |
Year | 2002 |
Country | India |
Producer(s) | National Sample Survey Office |
Sponsor(s) | M/o Statistics & Programme Implementation, GOI - MOSPI - |
Collection(s) | |
Metadata | Documentation in PDF |
Created on
Jul 29, 2016
Last modified
Sep 02, 2016
Page views
249926
Type of construction
(B7_q3)
File: Block7-records
File: Block7-records
Overview
Type:
Discrete Format: character Width: 1 | Valid cases: 40258 Invalid: 0 |
Questions and instructions
Check if Q.1 is not 0 then ask this Question
Type of construction
if Q.1 is 0 skip this question
Value | Category | Cases | |
---|---|---|---|
1 | New building | 7950 | 19.7% |
2 | Addition to floor space | 2437 | 6.1% |
3 | Alteration/improvement/major repair | 10983 | 27.3% |
5 | 18888 | 46.9% |
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Against item 2, serial numbers of construction 1 & 2 are already printed. Against item 3, type of construction will be recorded in codes in different columns. If there was one construction 'at the present premises' and one 'elsewhere, columns (3) and (5) with serial number 1 are to be used for recording information for these constructions. All columns are to be used when there are two constructions 'at the present premises' and two 'elsewhere'.
For construction of an entirely new building code 1 will be recorded. If extension of existing building results in the increase of floor area, it is to be considered as addition to floor area and code 2 will be recorded for such construction. Any type of remodelling, renovation or major repair work is to be treated as alteration/improvement/major repair and code 3 will be recorded for such constructions.
For construction of an entirely new building code 1 will be recorded. If extension of existing building results in the increase of floor area, it is to be considered as addition to floor area and code 2 will be recorded for such construction. Any type of remodelling, renovation or major repair work is to be treated as alteration/improvement/major repair and code 3 will be recorded for such constructions.
Others
Code 5 in this variable is incorrect and hence treat accordingly